Cooling never stops. Neither should the data.

Where a data centre uses evaporative cooling, most of its water goes into cooling tower make-up. We meter make-up and blowdown, track cycles against target, and give you the figures to report water against IT energy.

  • Cooling make-up
  • Blowdown
  • Cycles of concentration
  • WUE
Illustration of a typical data centreIllustration of a typical data centre
Where the water goes

A typical data centre, from source to use.

Sources

  • Municipal supply
  • Borewell
  • Tankers
  • Treated water

Storage and treatment

  • Raw water tanks
  • Softener and RO

Uses

  • Cooling tower make-up
  • Humidification
  • Domestic use

A typical layout. Every site differs, and the assessment maps yours.

Where it is lost

Three places to check for losses.

01

Make-up above baseline

Compare make-up water with cooling load and the agreed baseline to find changes hidden by monthly totals.

Explore WaterOS
02

Blowdown on a timer

Water is bled off on a schedule, so towers run at fewer cycles than they could.

Explore EcoVapure
03

Water through the exhaust

A share of every litre leaves through the tower fans, and is usually written off as unavoidable.

Explore EcoVapure
How we help

Assess, connect, then reduce.

Start here

Water Intelligence Assessment

Make-up, blowdown and domestic use mapped and measured, with a baseline and a roadmap.

How the assessment works
Then, every day

WaterOS

Hourly make-up and blowdown, with the metered figures you need to calculate WUE.

See WaterOS
For cooling towers

EcoVapure + WaterOS

Module in pilot

Cooling tower optimisation, and the EcoVapure Module to recover water from the tower exhaust.

See EcoVapure
Questions

Data centres: common questions.

Can you report WUE?

WaterOS gives the metered water figures. With your IT energy data, they give WUE in litres per kWh.

Is EcoVapure proven?

The EcoVapure Module is in pilot. A site review establishes suitability and a measurement plan; performance is verified against the agreed baseline.

See your data centre clearly.

Start with a Water Intelligence Assessment and a measured picture of where your water goes.